System operations is the longest segment of the system lifecycle, and the majority of a system’s costs occur here. System managers must get the most of system performance throughout the life of the system. This requires trained staff, robust tools (field test equipment and system modeling tools), and an understanding of the systems capacity and capabilities. Planned upgrades that can enhance system performance and system features must be engineered to minimize service disruption.
Contract Number:
DAAB07-01-D-H802
Contract Type: ID/IQ
Expiration Date: September 2011